Question

What is the use of Tacheometer in Preliminary survey?

a.

For taking longitudinal and cross levels

b.

For plotting main features

c.

For pegging the centre line

d.

For getting details of various features

Posted under Railway Engineering

Answer: (b).For plotting main features

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. What is the use of Tacheometer in Preliminary survey?

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. The survey done on site usually covers a width of 200m on either side of the alignment.

Q. Which among the following is not a part of the report prepared after Preliminary survey?

Q. When is the Final Location survey done?

Q. What is the objective of Final location survey?

Q. In Preliminary survey the total alignment is traversed with a Theodolite, but it is not necessary in Final location survey.

Q. In Final location survey at which points Masonry pillars are built?

Q. Which points should be considered while selecting the best alignment in Final location survey?

Q. In Characteristics of the Project Areas the geographical features of the country are given. These features do not affect the _______

Q. What does Category of a line indicates?

Q. The Permanent way section of the report does not give details about which of the following aspects?

Q. Which segment in the project report provides information and data related to the different routes that were examined for construction of the new rail line?

Q. What are the other details provided in the segment ‘Standard of construction’?

Q. Which section focuses on the problems that might be encountered, identifying areas requiring special attention and providing knowledge and information for finding solutions?

Q. Which section comments on the availability of water for various construction activities and its appropriateness for consumption?

Q. What is the order of arrangement of documents in the Report?

Q. Which among the following is not included in the Appendices to the report?

Q. Which organization provides the maps for satellite imagery?

Q. Using satellite imagery multiple corridors can be marked. After this the corridor that satisfies all the surveying criteria can be chosen.

Q. For which areas satellite imagery is most useful in the initial stages of planning?

Q. The miniature details for the preliminary survey can be can be worked out with the help of contour maps, computer aids and ______

Recommended Subjects

Are you eager to expand your knowledge beyond Railway Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!