Question

Why the time period for removal of form work has to be increased.

a.

The development of strength of concrete is retarded compared with development at normal temperature

b.

The development of strength of concrete is accelerate compared with development at normal temperature

c.

The development of strength of concrete is advanced compared with development at normal temperature

d.

The development of strength of concrete is precocious compared with development at normal temperature

Posted under Concrete Technology

Answer: (a).The development of strength of concrete is retarded compared with development at normal temperature

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. Why the time period for removal of form work has to be increased.

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. If concrete is exposed to repeated freezing and thawing after the final set, the final qualities of the concrete may also be __________

Q. Large temperature differentials within the concrete member may promote __________

Q. When the concrete in fresh stage is exposed to freeze before certain pre-hardening period, compressive strength may get __________

Q. Concrete is not recommended to be placed at a temperature above _________ºC.

Q. IS: 7861 part-1 deals with ___________

Q. A higher temperature of fresh concrete results in a __________ hydration of cement.

Q. Does this reduce handling time?

Q. Rapid evaporation may cause plastic shrinkage __________

Q. It is difficult to retain moisture for hydration for rapid evaporation of water during curing period.

Q. Prepacked concrete _________ water proofing concrete.

Q. Cement has ________ % volumetric shrinkage after curing.

Q. After vacuum mixing, the volumetric shrinkage can be raised from 3–5% to __________ % in different cements.

Q. Vacuum mixing systems reduce the exposure by _________ %.

Q. The exposure of conventional mixing in open bowl is about ___________ ppm in the breathing zone.

Q. The __________ compressive strength required from structural consideration.

Q. The adequate workability necessary for ___________ compaction with the compacting equipment available.

Q. ___________ water-cement ratio content to give adequate durability for the particular site conditions.

Q. _______ cement content to avoid shrinkage cracking due to temperature cycle in mass concrete.

Q. ________ has designated the concrete mixes into a number of grades as M10, M15.

Q. Maximum nominal size of aggregates to be used in concrete may be as large as possible within the limits prescribed by _______