Question
a.
A
b.
B
c.
C
d.
D
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. Correct distance obtained by an erroneous chain is:
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. If h is the difference in height between end points of a chain of length l, the required slope correction is
View solution
Q. The conventional sign shown in below figure represents a
View solution
Q. If L is the specified length of a tape, L1 its actual length and S the measured distance, then, the true distance is given by the formula,
View solution
Q. Accidental or compensating errors of length L are proportional to
View solution
Q. The following is the conventional sign of
View solution
Q. If α and β be the elevations of two objects A and B respectively, θ be the angle observed by a sextant. The correct horizontal angle is
View solution
Q. Following is a conventional sign of
View solution
Q. If Δ is the angle of deflection of a simple curve of radius R, the length of the curve is :
View solution
Q. The conventional sign shown in below figure represents a
View solution
Q. If Δ is the angle of deflection of a simple curve of radius R, the distance between the mid-point of the curve and long chord, is
View solution
Q. If F is the pull applied at the ends of tape in kg, l is the length of tape between end marks in metres, w is the weight of the tape in kg per metre run, then sag correction
View solution
Q. Correction per chain length of 100 links along a slope of α° is
View solution
Q. The Trapezoidal rule of volumes V of an embankment divided into a number of sections equidistant D, is given by
View solution
Q. Correction per chain length of 100 links along a slope of α radians, is
View solution
Q. In quadrantal bearing system, back bearing of a line may be obtained from its forward bearing, by
View solution
Q. Pick up the correct statement from the following:
View solution
Q. Pick up the method of surveying in which field observations and plotting proceed simultaneously from the following
View solution
Q. While viewing through a level telescope and moving the eye slightly, a relative movement occurs between the image of the levelling staff and the cross hairs. The instrument is
View solution
Q. In chain surveying field work is limited to
View solution
Q. Two concave lenses of 60 cm focal length are cemented on either side of a convex lens of 15 cm focal length. The focal length of the combination is
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!