a.
embankment on the centre line
b.
excavation on the centre line
c.
earth work on the centre line
d.
none of these.
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. Deviation of the actual road gradient from the proposed contou'r gradient up hill side, involves
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. Measuring with a 30 m chain, 0.01 m too short, introduces
View solution
Q. Setting out a curve by two theodolite method, involves
View solution
Q. When the bubble of the level tube of a level, remains central
View solution
Q. The operation of making the algebraic sum of latitudes and departures of a closed traverse, each equal to zero, is known
View solution
Q. Orientation of a plane table by solving two point problem is only adopted when
View solution
Q. A back sight
View solution
Q. Metric chains are generally available in
View solution
Q. On a diagonal scale, it is possible to read up to
View solution
Q. Plotting of inaccessible points on a plane table, is done by
View solution
Q. A dumpy level is set up with its eye-piece vertically over a peg A. The height from the top of peg A to the centre of the eye-piece is 1.540 m and the reading on peg B is 0.705 m. The level is then setup over B. The height of the eye-piece above peg B is 1.490 m and a reading on A is 2.195 m. The difference in level between A and B is
View solution
Q. Probable systematic error in precise levelling as recommended by International Geodetic Association should not exceed (where k is in kilometers.)
View solution
Q. The diaphragm of a stadia theodolite is fitted with two additional
View solution
Q. Centering error of a theodolite produces an error
View solution
Q. In levelling operation
View solution
Q. Pick up the correct statement from the following :
View solution
Q. In optical reading instruments
View solution
Q. For setting out a simple curve, using two theodolites.
View solution
Q. Geodetic surveying is undertaken
View solution
Q. The desired sensitivity of a bubble tube with 2 mm divisions is 30". The radius of the bubble tube should be
View solution
Q. A dumpy level was set up at the midpoint between two pegs A and B, 50 m apart and the staff readings at A and B were 1.22 and 1.06. With the level set up a A, the readings at A and B were 1.55 and 1.37. The collimation error per 100 m length of sight is
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!