Question
a.
It is provided in between the lower end of the house drain and the street sewer
b.
It is provided a cleaning eye at the top of the trap
c.
The height of fresh air inlet pipe fixed vertically with wall is 3 m
d.
The water seal is less than that of ordinary traps.
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. Pick up the incorrect statement regarding a master trap from the following :
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. The concrete work for the following part of the building of specified thickness is measured in square metres
View solution
Q. Pick up the correct statement from the following:
View solution
Q. The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
View solution
Q. The measurement is not made in square metres in case of
View solution
Q. According to ISI method of measurement, the order of the sequence is
View solution
Q. The assumption on which the trapezoidal formula for volumes is based, is
View solution
Q. The cross-sections for a highway is taken at
View solution
Q. The detention period in a septic tank is assumed
View solution
Q. The area is measured correct to the nearest
View solution
Q. Cost of fittings and their fixing is specified for the following sanitary fittings
View solution
Q. The volume is measured correct to the nearest
View solution
Q. Pick up the correct statement from the following:
View solution
Q. Pick up the item whose weight is added to the weight of respective item, is
View solution
Q. Size, capacity and materials need be specified for
View solution
Q. A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
View solution
Q. The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is
View solution
Q. Anti-siphonage pipe is connected to
View solution
Q. According to Indian Standards Institute, the actual size of modular bricks is
View solution
Q. While estimating the qualities for the construction of a building, the correct metric unit is
View solution
Q. The slope of the oultet of 'P trap' below the horizontal is kept
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!