Question
a.
0.01 sqm
b.
0.02 sqm
c.
0.03 sqm
d.
0.04 sqm
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. The area is measured correct to the nearest
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. Cost of fittings and their fixing is specified for the following sanitary fittings
View solution
Q. The volume is measured correct to the nearest
View solution
Q. Pick up the correct statement from the following:
View solution
Q. Pick up the item whose weight is added to the weight of respective item, is
View solution
Q. Size, capacity and materials need be specified for
View solution
Q. A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
View solution
Q. The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is
View solution
Q. Anti-siphonage pipe is connected to
View solution
Q. According to Indian Standards Institute, the actual size of modular bricks is
View solution
Q. While estimating the qualities for the construction of a building, the correct metric unit is
View solution
Q. The slope of the oultet of 'P trap' below the horizontal is kept
View solution
Q. Pick up the correct statement from the following:
View solution
Q. The unit of measurement is per quintal for the following:
View solution
Q. Pick up the correct statement from the following:
View solution
Q. The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by prismoidal formula, is
View solution
Q. The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
View solution
Q. Pick up the correct statement from the following:
View solution
Q. The weight of an item is measured correct to nearest
View solution
Q. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
View solution
Q. Pick up the correct statement from the following:
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!