Question

Pick up the correct statement from the following:

a.

The earth work of cutting in trenches or borrow pits in fairly uniform ground is measured with the help of average depths of the dead men

b.

The earth work in trenches or borrow pits in irregular ground is measured by taking the difference in levels before and after completion of work

c.

The earth work in trenches or borrow pits, where neither a nor b is feasible, are measured from the fillings after deduction of voids

d.

All the above.

Answer: (d).All the above.

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. Pick up the correct statement from the following:

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. Pick up the item whose weight is added to the weight of respective item, is

Q. Size, capacity and materials need be specified for

Q. A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is

Q. The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is

Q. Anti-siphonage pipe is connected to

Q. According to Indian Standards Institute, the actual size of modular bricks is

Q. While estimating the qualities for the construction of a building, the correct metric unit is

Q. The slope of the oultet of 'P trap' below the horizontal is kept

Q. Pick up the correct statement from the following:

Q. The unit of measurement is per quintal for the following:

Q. Pick up the correct statement from the following:

Q. The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by prismoidal formula, is

Q. The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended

Q. Pick up the correct statement from the following:

Q. The weight of an item is measured correct to nearest

Q. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds

Q. Pick up the correct statement from the following:

Q. The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is

Q. Pick up the correct statement from the following:

Q. The following item of earth work is not measured separately.

Recommended Subjects

Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!