Question
a.
1/2 horizontal to 1 vertical
b.
2/3 horizontal to 1 vertical
c.
1 horizontal to 1 vertical
d.
2 horizontals to 1 vertical.
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. The range of spread from the wall base to outer edge of a brick work foundation does not exceed
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. Nogging of a common wooden partition is
View solution
Q. Ornamental moulded course placed on the top of a wall, is
View solution
Q. The size of a floor tile commonly used, is
View solution
Q. The triangular portion between any two adjacent arches and the tangent to their crowns, is
View solution
Q. The depth of excavation of foundations, is generally measured with a
View solution
Q. Which one of the following piles has a cast iron shoe even after removal of the hollow cylindrical steel casing
View solution
Q. If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is
View solution
Q. Pick up the correct statement from the following :
View solution
Q. Pick up the incorrect statement from the following :
View solution
Q. For effective drainage, the finished surface of flat roof should have a minimum slope of
View solution
Q. The stone whose crushing strength is least, is
View solution
Q. Best type of piles for soft soil having little resistance to the flow of concrete, is
View solution
Q. A wall constructed to resist the pressure of an earth filling, is called
View solution
Q. The bearing capacity of a water logged soil, may be improved by
View solution
Q. The additional piles which are driven to increase the capacity of supporting loads on vertical piles, are known
View solution
Q. The bearing capacity of piles is determined by
View solution
Q. A covering of concrete placed on the exposed top of an external wall, is known as
View solution
Q. Auger boring
View solution
Q. A roof which slopes in four directions, is called
View solution
Q. The formWork including the props can be removed from beams, only after
View solution