Question
a.
1 metre
b.
2 metres
c.
3 metres
d.
4 metres.
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. For each storey of a building, the depth of exploration should be
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. Safe bearing capacity of black cotton soil varies from
View solution
Q. Crown is located at
View solution
Q. The nominal thickness of an expansion joint in brick walls, is kept more than
View solution
Q. The nominal thickness of one brick wall in mm, is
View solution
Q. The pile which supports the load partly by friction and partly by resting on hard stratum, is called
View solution
Q. To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as
View solution
Q. The concrete slump recommended for foundations, is
View solution
Q. The minimum thickness of walls built in cement mortar (1 : 6) for a single storey building, is
View solution
Q. The form work from the slabs excluding props, can be removed only after
View solution
Q. The pile provided with one or more bulles in its vertical shaft, is generally known as
View solution
Q. To construct a 10 cm thick partition wall, you will prefer
View solution
Q. The pile which supports the load due to friction between pile face and surrounding soil, is generally known as
View solution
Q. The voussoir placed at crown of an arch, is known as a
View solution
Q. The vertical members fixed between steps and hand rail, are known
View solution
Q. Pick up the consideration to the taken while designing a hospital from the following :
View solution
Q. The form work from the sides of beams can be removed only after
View solution
Q. In soils possessing low bearing capacity, the type of foundation generally provided, is
View solution
Q. Which one of the following activities is not correct as applicable to brick corbels
View solution
Q. Pick up the correct statements from the following :
View solution
Q. Rotary drilling is the fastest method in case of
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!