Question

High pressure grouting is generally restored for concreting in the lining if the rock strata is:

a.

highly fissured

b.

poor

c.

likely to get seepage of water

d.

All of the above.

Posted under Civil Engineering

Answer: (d).All of the above.

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. High pressure grouting is generally restored for concreting in the lining if the rock strata is:

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. For hauling muck from the tunnel, the following type of muck-car is used :

Q. Which one of the following methods is adopted for permanent drainage of tunnels :

Q. Pick up the correct statement regarding drilling a tunnel from the following:

Q. For tunnels exceeding 300 m in length, the grade should be provided below

Q. The method of draining in the tunnels, is generally known as

Q. Pick up the correct statement from the following during tunnel excavation,

Q. To attain the required shape of the tunnel section, we use :

Q. Pick up the mechanical ventilation method used for tunnels from the following:

Q. Which one of the following methods of tunnelling does not require the use of time bearing :

Q. For highways, tunnelling is preferred to if the open cut exceeds :

Q. The following operations are required for tunnelling in rocky terrain :

1. Removing the foul gases
2. Marking the tunnel profile
3. Setting up and drilling
4. Checking misfire
5. Mucking

The correct sequence is :

Q. The advantages of providing a pair of tunnels as compared to only one large highway tunnel is :

Q. Which one of the following statements is not correct in respect of setting of an inclined tunnel:

Q. Forepoling method is generally adopted for tunnelling in :

Q. Concrete lining is provided concurrently with the driving operation in case of

Q. The concentration of the dust particles of the size 0.5 to 5 microns adjacent to the working face should not be more than

Q. Which one of the following statements is not correct with regard to heading and hench-ing method of tunnelling.

Q. The most commonly adopted pattern of cut holes is :

Q. Which one of the following linings is suitable for shield driven tunnels particularly in the subaqueous regions :

Q. In case of railways,