Joint sealing compounds are impermeable ductile materials which are required to ___________________

a.

increase the bond

b.

provide a watertight seal by adhesion to concrete

c.

shorten the water path

d.

avoid the risk of a fault in an embedded water bar

Posted under Irrigation Engineering

Answer: (b).provide a watertight seal by adhesion to concrete

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. Joint sealing compounds are impermeable ductile materials which are required to ___________________

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. Which of the following is sometimes used in expansion joints to avoid the risk of fault in an embedded water bar?

Q. What provides a permanent watertight seal during the whole range of joint movement?

Q. Which of the following can be used as support for an effective joint sealing compound in floor and floor joints?

Q. What is the maximum expansion or contraction allowed for the joint filler material with an initial gap of about 30 mm?

Q. The expansion joints in floors and walls should normally be provided at a spacing of not more than ___________

Q. In reinforced concrete floors, the movement joints should normally be spaced at a maximum spacing of ____________

Q. Which of the following is a movement joint with complete discontinuity in both reinforcement and concrete and intended to accommodate either expansion or contraction of the structure?

Q. Which of the following is a movement joint with deliberate discontinuity but no initial gap?

Q. A partial contraction joint is the one in which?

Q. Which of the following is not a movement joint?

Q. Which of the following is usually adopted for contraction and construction joints?

Q. Calculate the value of hydraulic mean radius for a channel designed by Lacey’s theory which has a mean velocity of 1m/sec. The silt factor can be taken as unity.

Q. Calculate the depth of cut-off for scour holes for an irrigation channel of F.S.Q equal to 354 cumecs and H.F.Q of natural drainage equal to 600 cumecs. Assume the value of friction factor as 1.

Q. A siphon aqueduct is constructed at a canal crossing site where drainage HFL was 212.2 m by allowing an afflux of 0.4 m at high flood discharge. At this site, the water level downstream of the crossing at the same high flood will be _________

Q. The floor of a siphon aqueduct needs to be designed for conditions when?

i. The canal and drainage are flowing full
ii. The canal is full and there is no drainage discharge
iii. The canal is empty and drainage discharge is full

Q. The head loss through a siphon barrel is usually given by Unwin’s formula by neglecting velocity of approach as HL = [1 + F₁ + F₂. L/R] V²/2g, where F₁ and F₂ respectively represent the coefficient of head losses due to?

Q. Which of the following wings protect the earthen slopes of the canal and also guide the drainage water?

Q. The greater is the fluming, the greater is the length of upstream and downstream transition wings.

Q. To reduce the cost of the CD works we resort to _____

Q. In a siphon aqueduct, the worst condition of uplift on the floor occurs when ________

Recommended Subjects

Are you eager to expand your knowledge beyond Irrigation Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!