The velocity of approach has found to be negligible effect upon discharge if ____________

a.

the ratio H/Hd is more than 1.33

b.

the ratio H/Hd is less than 1.33

c.

the ratio H/Hd is equal to zero

d.

the ratio H/Hd is more than 1

Posted under Irrigation Engineering

Answer: (a).the ratio H/Hd is more than 1.33

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. The velocity of approach has found to be negligible effect upon discharge if ____________

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. If a flood enters a dam reservoir at F.R.L, the efficiency of its ogee spillway will ______________

Q. The downstream apron of the ogee spillway is found to have a negligible effect on the coefficient of discharge when the value of ________________

Q. What is the value of the pier abutment coefficient for pointed nose piers?

Q. What is the value of abutment contraction coefficient for square abutment with headwall perpendicular to the direction of flow?

Q. What is the assumption that is taken during the entire design of an overflow spillway?

Q. The greater is the divergence from the streamline flow, greater is the contraction coefficient.

Q. Calculate the effective length of the spillway which consists of 6 spans having a clear width of 10 m each. The thickness of each pier may be taken as 2.5 m and the total design head on the crest including velocity head is 16.3 m. Assuming 90° cut water nose piers and rounded abutments.

Q. Which of the following is the simplest type of spillway which can be provided independently and at low costs?

Q. If the spillway is constructed in continuation to the dam at one end, it may be called as ________

Q. The spillway which can be adopted with ease on gravity as well as earthen dams is _________________

Q. The famous Bhakra dam of India is provided with ________________

Q. The surplus reservoir water after spilling over the crest of the spillway flows on the chute is __________________

Q. Whenever the slope of chute changes from steeper to milder ____________________ curve shall be provided.

Q. The side slope of approach channel of chute spillway is ___________________

Q. The spillway which may sometimes be called as a waste weir is ______________________

Q. The portion of a chute spillway which is known as its control structure is ________________

Q. The type of spillway which is provided on narrow valleys where no side flanks are available is ____________________

Q. Which of the following curve is provided when the slope of the chute changes from milder to steeper?

Q. Calculate the freeboard for the top levels of the side walls if the mean velocity of water in the chute reach is 3.5 m/s and the mean depth of water in the chute reach under consideration is 4.7 m.

Q. The minimum slope of the chute is governed by the condition that _____________

Recommended Subjects

Are you eager to expand your knowledge beyond Irrigation Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!