The portion of a chute spillway which is known as its control structure is ________________

a.

low ogee weir

b.

chute channel

c.

approach channel leading the water from the reservoir to the ogee weir

d.

silting basin at its bottom

Posted under Irrigation Engineering

Answer: (a).low ogee weir

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. The portion of a chute spillway which is known as its control structure is ________________

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. The type of spillway which is provided on narrow valleys where no side flanks are available is ____________________

Q. Which of the following curve is provided when the slope of the chute changes from milder to steeper?

Q. Calculate the freeboard for the top levels of the side walls if the mean velocity of water in the chute reach is 3.5 m/s and the mean depth of water in the chute reach under consideration is 4.7 m.

Q. The minimum slope of the chute is governed by the condition that _____________

Q. What is the approximate percentage of light reinforcement that is provided in the top of the reinforced concrete slabs at the base?

Q. A shaft spillway is located _______________________

Q. The siphons installed within a gravity dam to spill the surplus reservoir water are known as ______________________

Q. The siphons installed over overflow dams constitute what are known as __________________

Q. The only spillway among the following through which the discharge does not increase as fast as it increases in all others is _________________

Q. The only spillway among the following through which the discharge is almost at its capacity rate even from the start of its functioning is ________________

Q. An air vent is provided at FRL to break the siphoning action at that level in a ___________________

Q. Which of the following spillway is designed in India by Ganesh Iyer?

Q. The crest of a siphon spillway is fixed at ________________

Q. A siphon spillway is sufficiently independent of the water surface elevation of the reservoir.

Q. The allowable maximum negative head on an average is equal to __________

Q. The structure which is not used in a shaft spillway is ________________

Q. Morning glory is the _____________________________

Q. For a saddle siphon, the maximum operative head is 4.53 m. The width and height of the throat of the siphon are 5 m and 2.25 m respectively. The coefficient of discharge is 0.90. How many units are required to pass a flood of 350 cumecs? (Assume g = 10 m/s2)

Q. A siphon spillway in a concrete gravity dam is in the shape of ________________

Q. The energy dissipation at the toe of the spillway is affected basically by the use of hydraulic jump in _______________________

Recommended Subjects

Are you eager to expand your knowledge beyond Irrigation Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!