A nuclear power development scheme is essentially a _____________________

a.

thermal power scheme

b.

hydropower scheme

c.

both thermal and hydropower scheme

d.

atomic power scheme

Posted under Irrigation Engineering

Answer: (a).thermal power scheme

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. A nuclear power development scheme is essentially a _____________________

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. Fossil fuels are used in _____________________

Q. A runoff river plant for hydropower generation is essentially a ________________________

Q. A storage hydro plant essentially involves ________________

Q. The natural high waterfalls may be used for generation of ____________________

Q. Which among the following is an example of a tidal plant?

Q. When the powerhouse is located near the dam as is done in the low head installations, it is known as _________________

Q. Which of the following plants utilize the minimum flow in a river having no appreciable pondage on its upstream side?

Q. Which among the following plant generates power during peak hours?

Q. Which of the following dam is not an example of High head scheme?

Q. Pondage in a hydropower station is _________________________________

Q. In a low head scheme, a weir or barrage is constructed to raise the water level.

Q. Which of the following plant uses a reversible turbine that can work at relatively high efficiencies and helps in reducing the cost of such a plant?

Q. As per estimate made by the Central Electricity Authority, the potential of the country is accessed at 84 GW at load factor value of _________________

Q. The first power station of India was installed at _________________

Q. What is the correct expansion of DAE?

Q. In India, the nuclear power generation is about ____________ of the total power generation.

Q. Which one is the first nuclear power plant in India?

Q. Convert the hydropower potential of 84 GW at 60% load factor into Trillion watts hour.

Q. The minimum power which a hydropower plant can generate throughout the year is called as ________________

Q. If the peak load for a power plant equals the plant capacity then the ratio of the capacity factor to load factor will be _________________

Recommended Subjects

Are you eager to expand your knowledge beyond Irrigation Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!