Question

A soil deposit has three layers of soil. The permeability of the second layer is twice that of the first layer and the permeability of the third layer is thrice that of the first layer. The thickness of each layer is 5m. What will be its average permeability parallel to the bedding plane?

a.

k

b.

2k

c.

3k

d.

4k

Answer: (b).2k

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. A soil deposit has three layers of soil. The permeability of the second layer is twice that of the first layer and the permeability of the third layer is thrice that of the first...

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. The average permeability perpendicular to the bedding planes is given by________

Q. The average permeability parallel to the bedding planes is given by________

Q. The average coefficient of permeability of whole deposit will depend upon _________

Q. Each layer of stratified soil deposit has its own coefficient of permeability.

Q. The hydraulic gradient (i), used in capillary-permeability test is ____________

Q. The possible directions of flow of the soil deposit with respect to the bedding planes are ___________

Q. The saturation in capillary-permeability is assumed to be ___________ percentage.

Q. The degree of saturation in capillarity-permeability test can be found out by ___________

Q. The average permeability of soil deposits depends on __________

Q. Each layer of soil layer has its own value of ___________

Q. The bedding planes of soil layers in soil mass may be __________

Q. The capillary-permeability test, is used to determine ___________

Q. The capillarity-permeability test may be also called as ___________

Q. The permeameter assembly is placed in ____________ of the Jodhpur permeameter apparatus.

Q. The specimen in permeameter is compacted dynamically using___________

Q. If permeability at proctor’s maximum dry density is required, which of the following method can be used?

Q. Which of the following tools is not used in static compaction?

Q. What is the diameter of the permeameter mould (i.e. Cylinder), used in Jodhpur permeameter?

Q. The Remoulded specimen in Jodhpur Permeameter, can be prepared by ___________

Q. Which of the following permeability test, can be done in Jodhpur permeameter?

Recommended Subjects

Are you eager to expand your knowledge beyond Geotechnical Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!