Question

To find pre-consolidation pressure, __________ relationship in graph is plotted.

a.

voids ratio and effective pressure

b.

effective pressure and total pressure

c.

effective pressure and pore pressure

d.

total pressure and total pressure

Answer: (a).voids ratio and effective pressure

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. To find pre-consolidation pressure, __________ relationship in graph is plotted.

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. To find pre-consolidation pressure, __________ graph is used.

Q. In finding pre-consolidation pressure, the lower portion of the curve is ________________

Q. Who founded the method of determination of pre-consolidation pressure?

Q. In determination of pre-consolidation pressure, ___________ point of virgin curve is selected.

Q. For successful dewatering in fine, non-cohesive soils, _________ method is used.

Q. For the use of vacuum method, the Dā‚ā‚€ should be __________

Q. For the use of vacuum method, the coefficient of permeability should be __________

Q. The suction head ____________ capillary head in vacuum method of dewatering.

Q. In vacuum method, the top of bore hole is sealed by __________

Q. In vacuum method, the ground surface is subjected to unbalanced atmospheric pressure.

Q. The fine grained cohesive soils can be stabilised by ______

Q. The dewatering of soil by electro-osmosis was developed by ______

Q. The electro-osmosis method of dewatering increases ______

Q. The velocity of flow towards cathode in electro-osmosis method is given by _________

Q. In vacuum method, the vacuum drawn on the well-point stiffened the sub-soil to carry out excavations.

Q. In electro-osmosis method, when direct current is applied to the electrodes, the soil water will _________

Q. The removal of excess of water from the saturated soil mass is called __________

Q. Which one of the following method can be used to lower water table, using gravity flow?

Q. The diameter of the perforated pipe used in well point system is __________

Q. The ground water table may be lowered by which of the following methods?

Recommended Subjects

Are you eager to expand your knowledge beyond Geotechnical Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!