Question

In finding pre-consolidation pressure, the lower portion of the curve is ________________

a.

parabolic curve

b.

swelling curve

c.

expansion curve

d.

straight line

Answer: (d).straight line

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. In finding pre-consolidation pressure, the lower portion of the curve is ________________

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. Who founded the method of determination of pre-consolidation pressure?

Q. In determination of pre-consolidation pressure, ___________ point of virgin curve is selected.

Q. For successful dewatering in fine, non-cohesive soils, _________ method is used.

Q. For the use of vacuum method, the Dā‚ā‚€ should be __________

Q. For the use of vacuum method, the coefficient of permeability should be __________

Q. The suction head ____________ capillary head in vacuum method of dewatering.

Q. In vacuum method, the top of bore hole is sealed by __________

Q. In vacuum method, the ground surface is subjected to unbalanced atmospheric pressure.

Q. The fine grained cohesive soils can be stabilised by ______

Q. The dewatering of soil by electro-osmosis was developed by ______

Q. The electro-osmosis method of dewatering increases ______

Q. The velocity of flow towards cathode in electro-osmosis method is given by _________

Q. In vacuum method, the vacuum drawn on the well-point stiffened the sub-soil to carry out excavations.

Q. In electro-osmosis method, when direct current is applied to the electrodes, the soil water will _________

Q. The removal of excess of water from the saturated soil mass is called __________

Q. Which one of the following method can be used to lower water table, using gravity flow?

Q. The diameter of the perforated pipe used in well point system is __________

Q. The ground water table may be lowered by which of the following methods?

Q. What is the minimum depth of water that can be brought to the surface in well point system?

Q. For dewatering more than 6m below the water table, which of the following method is used?

Recommended Subjects

Are you eager to expand your knowledge beyond Geotechnical Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!