Dam Design and Construction MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Dam Design and Construction, a fundamental topic in the field of Irrigation Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Dam Design and Construction MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Dam Design and Construction mcq questions that explore various aspects of Dam Design and Construction problems. Each MCQ is crafted to challenge your understanding of Dam Design and Construction principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Irrigation Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Dam Design and Construction MCQs are your pathway to success in mastering this essential Irrigation Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Dam Design and Construction. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Dam Design and Construction knowledge to the test? Let's get started with our carefully curated MCQs!

Dam Design and Construction MCQs | Page 15 of 16

Discover more Topics under Irrigation Engineering

Q141.
Which of the following component of a buttress dam is also called counterfort?
Discuss
Answer: (b).Buttress
Q142.
Which of the following type of dam requires very strong and stable foundations and is not in use as much as the other types?
Discuss
Answer: (c).Columnar buttress type dam
Q143.
Which of the following is the earliest recorded multiple arch buttress dam?
Discuss
Answer: (a).Meer Alam dam in India
Q144.
In a simple deck slab buttress dam of a given height, the buttress spacing can be increased by increasing the upstream slope.
Discuss
Answer: (a).True
Q145.
The base width of a rock-fill dam in comparison to that of an earthen dam is _______________
Discuss
Answer: (b).much smaller
Q146.
On moderate foundations and particularly in seismic areas, the type of dam which can preferably be considered for construction is ___________________
Discuss
Answer: (c).rock-fill dam
Q147.
According to Terzaghi, the ratio of Dโ‚โ‚… of filter to Dโ‚โ‚… of base material should be _____________
Discuss
Answer: (c).4 to 5
Q148.
Which of the following is not provided in order to control the possibility of sand boiling?
Discuss
Answer: (c).Vertical cut-offs
Q149.
The seepage forces within the filter are controlled up to permissible small magnitudes when the ratio of Dโ‚โ‚… of filter to Dโ‚โ‚… of base material is ___________________
Discuss
Answer: (a).between 5 to 40
Q150.
The buttresses of a free deck buttress dam are provided at โ€˜xโ€™ m clear spacing and buttress thickness is proposed to be โ€˜tโ€™ m. The buttress section can then be designed like the section of a concrete gravity dam by considering the effective unit weight of water = Surcharge factor (S) x actual unit weight of water. The value of this surcharge factor is given as _____________
Discuss
Answer: (b).S = (x + t)/t