Spillways and Spillway Gates MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Spillways and Spillway Gates, a fundamental topic in the field of Irrigation Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Spillways and Spillway Gates MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Spillways and Spillway Gates mcq questions that explore various aspects of Spillways and Spillway Gates problems. Each MCQ is crafted to challenge your understanding of Spillways and Spillway Gates principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Irrigation Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Spillways and Spillway Gates MCQs are your pathway to success in mastering this essential Irrigation Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Spillways and Spillway Gates. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Spillways and Spillway Gates knowledge to the test? Let's get started with our carefully curated MCQs!

Spillways and Spillway Gates MCQs | Page 6 of 9

Discover more Topics under Irrigation Engineering

Q51.
The discharge passing over an ogee spillway per unit length of its apex line is proportional ___________________
Discuss
Answer: (d).H^3/2
Q52.
When the crest of an ogee spillway is designed to be in accordance with the lower nappe of a free-falling water jet over a duly ventilated sharp-crested weir then theoretically
Discuss
Answer: (a).The pressure on the spillway crest will be zero at design head only
Q53.
When the gated sluices are provided through the body of the dam spillway then the ogee spillway structure shall normally be of Corbel type.
Discuss
Answer: (b).False
Q54.
The velocity of approach has found to be negligible effect upon discharge if ____________
Discuss
Answer: (a).the ratio H/Hd is more than 1.33
Q55.
If a flood enters a dam reservoir at F.R.L, the efficiency of its ogee spillway will ______________
Discuss
Answer: (a).increase with the increasing head
Q56.
The downstream apron of the ogee spillway is found to have a negligible effect on the coefficient of discharge when the value of ________________
Discuss
Answer: (b).(Hd + d) / He exceeds 1.7
Q57.
When the tail-water depths in the river downstream of a spillway are quite low such that the tail-water curve at all discharges lies below the post jump depth curve, then the energy dissipation can be affected best by ___________________
Discuss
Answer: (b).a ski-jump bucket
Q58.
The device which does not help in energy dissipation at the bottom of a hydraulic structure over which water spills is ________________
Discuss
Answer: (c).morning glory
Discuss
Answer: (a).it destroys more than 90% of total energy by the turbulence produced in the jump
Q60.
A ski-jump bucket is also known as _____________________
Discuss
Answer: (a).flip bucket
Page 6 of 9