Spillways and Spillway Gates MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Spillways and Spillway Gates, a fundamental topic in the field of Irrigation Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Spillways and Spillway Gates MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Spillways and Spillway Gates mcq questions that explore various aspects of Spillways and Spillway Gates problems. Each MCQ is crafted to challenge your understanding of Spillways and Spillway Gates principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Irrigation Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Spillways and Spillway Gates MCQs are your pathway to success in mastering this essential Irrigation Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Spillways and Spillway Gates. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Spillways and Spillway Gates knowledge to the test? Let's get started with our carefully curated MCQs!

Spillways and Spillway Gates MCQs | Page 4 of 9

Q31.
The spillway which can be adopted with ease on gravity as well as earthen dams is _________________
Discuss
Answer: (b).chute spillway
Q32.
The famous Bhakra dam of India is provided with ________________
Discuss
Answer: (a).trough spillway
Q33.
The surplus reservoir water after spilling over the crest of the spillway flows on the chute is __________________
Discuss
Answer: (b).parallel to the crest in a side-channel spillway
Q34.
Whenever the slope of chute changes from steeper to milder ____________________ curve shall be provided.
Discuss
Answer: (a).a concave vertical curve
Q35.
The side slope of approach channel of chute spillway is ___________________
Discuss
Answer: (a).1:1
Q36.
The spillway which may sometimes be called as a waste weir is ______________________
Discuss
Answer: (b).a trough spillway
Q37.
The portion of a chute spillway which is known as its control structure is ________________
Discuss
Answer: (a).low ogee weir
Q38.
The type of spillway which is provided on narrow valleys where no side flanks are available is ____________________
Discuss
Answer: (c).side-channel spillway
Q39.
Which of the following curve is provided when the slope of the chute changes from milder to steeper?
Discuss
Answer: (c).Convex vertical curve
Q40.
Calculate the freeboard for the top levels of the side walls if the mean velocity of water in the chute reach is 3.5 m/s and the mean depth of water in the chute reach under consideration is 4.7 m.
Discuss
Answer: (c).0.85 m
Page 4 of 9