Question

Final technical authority of a project lies with

a.

Assistant Engineer

b.

Executive Engineer

c.

Superintending Engineer

d.

Chief Engineer.

Posted under Civil Engineering

Answer: (d).Chief Engineer.

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. Final technical authority of a project lies with

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be

Q. Works costing less than Rs. 20,000 are treated as

Q. A critical ratio scheduling

Q. Bar charts are suitable for

Q. The first method invented for planning projects, was

Q. An Executive Engineer may have powers upto

Q. The main principle of an organisation, is

Q. The estimated time required to perform an activity, is known as

Q. A CPM family includes

Q. The time which results in the leasi, possible construction cost of an activity, is known

Q. Military organisation is known as

Q. Pick up the incorrect statement from the following:

Q. Various activities of a project, are shown on bar charts by

Q. Time and progress chart of a construction, is also known as

Q. Critical Path Net Work helps an engineer

Q. Pick up the correct statement from the following:

Q. Which one of the following represents an event ?

Q. Pick up the incorrect statement from the following:

Q. Frequency distribution curves

Q. If t is the duration of an activity, t1 is the latest finish possible moment of its preceding activity and t2 is the earliest start possible moment, the independent float of the activity is

Recommended Subjects

Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!