Question

While estimating a reinforced cement structure, the omitted cover of concrete is assumed

a.

at the end of reminforcing bar, not less than 25 mm or twice the diameter of the bar

b.

in thin slabs, 12 mm minimum or diameter of the bar whichever is more

c.

for reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more

d.

All the above.

Answer: (d).All the above.

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. While estimating a reinforced cement structure, the omitted cover of concrete is assumed

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as

Q. Pick up the incorrect statement from the following:

Q. If tensile stress of a steel rod of diameter D is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is

Q. Pick up the correct statement in case of water supply.

Q. In case of laying gullies, siphons, intercepting traps, the cost includes

Q. In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

Q. The height of the sink of wash basin above floor level is kept

Q. While preparing a detailed estimate

Q. The plinth area of a building not includes

Q. For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is

Q. The minimum width of a septic tank is taken

Q. The item of the brick structure measured in sq.m, is

Q. The inspection pit or chamber is a manhole provided in a base drainage system

Q. Pick up the excavation where measurements are made in square metres for payment.

Q. The expected out turn of 2.5 cm cement concrete floor per manson per day

Q. A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.

Q. The order of booking dimensions is

Q. As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken

Q. Pick up the item of work not included in the plinth area estimate

Q. Pick up the correct statement from the following:

Recommended Subjects

Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!