a.
H = 90 m High gravity dam
b.
H = 90 m Low gravity dam
c.
H = 214.2 m High gravity dam
d.
H = 214.2 m Low gravity dam
Posted under Irrigation Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. A concrete gravity dam having a maximum reservoir level at 200 m and the RL of the bottom of the dam 100 m. The maximum allowable compressive stress in concrete is 3000 KN/m² and...
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. The axis of a gravity dam is the ______________________
View solution
Q. Presence of tail-water in a gravity dam ____________________
View solution
Q. The provision of drainage gallery in a gravity dam helps in reducing ____________________
View solution
Q. Which of the following attempts are made to reduce the uplift in order to economize on the provided section of a concrete gravity dam?
i. Providing drainage gallery to collect seepage water
ii. Constructing cut-off under upstream face
iii. Pressure grouting in dam foundation
iv. Provision of shear keys or keyways
View solution
Q. Transverse joints in concrete gravity dams are the ___________________________
View solution
Q. Leakage through the transverse joints in a gravity dam is prevented by ____________
View solution
Q. In order to reduce uplift on a gravity dam, the type of grouting done is ____________________
View solution
Q. The general value of lift for concrete is taken as __________________
View solution
Q. The horizontal joints that extends through the entire width of the dam section and are developed at each lift height is called as ___________________
View solution
Q. Which of the following joints justifies the two-dimensional analysis of gravity dams?
View solution
Q. The foundation pressure used in the pressure grouting is equal to _________________
View solution
Q. Which of the following earth dam is suitable only on impervious foundation?
View solution
Q. Which of the following zone in Zoned type embankment prevents piping through cracks?
View solution
Q. Which of the following soil material is most preferred for the central core material of zoned embankment type dam?
View solution
Q. Which embankment has the thickness of the diaphragm at an elevation less than 10 meters or the height of the embankment above the corresponding elevation?
View solution
Q. The blanket in earth dam is provided ___________________
View solution
Q. Which of the following statement is correct with reference to earthen dams?
View solution
Q. During the construction of an earthen dam by hydraulic fill method, development of pore pressure becomes important in the __________________
View solution
Q. The process of laying and compacting earth in layers by power rollers under OMC for construction of earthen dams is known as ______________________
View solution
Q. The central core of the zoned embankment type earth dam ________________________
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Irrigation Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!