Surveying MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Surveying, a fundamental topic in the field of Civil Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Surveying MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Surveying mcq questions that explore various aspects of Surveying problems. Each MCQ is crafted to challenge your understanding of Surveying principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Civil Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Surveying MCQs are your pathway to success in mastering this essential Civil Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Surveying. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Surveying knowledge to the test? Let's get started with our carefully curated MCQs!

Surveying MCQs | Page 4 of 37

Discover more Topics under Civil Engineering

Q31.
For a closed traverse the omitted measurements may be calculated
Discuss
Answer: (d).all the above.
Q32.
The slope correction for a length of 30 m along a gradient of 1 in 20, is
Discuss
Answer: (a).3.75 cm
Discuss
Answer: (b).from whole to the part
Discuss
Answer: (c).both longitudinal and cross sections are required
Q35.
If the radius of a simple curve is R, the length of the chord for calculating offsets by the method of chords produced, should not exceed.
Discuss
Answer: (c).R/20
Q36.
The distance between the point of intersection of an up grade + g1% and downgrade g2% and the highest point of the vertical curve of length L, is

a.

A

b.

B

c.

C

d.

D

Discuss
Answer: (d).D
Q37.
If V is the speed of a locomotive in km per hour, g is the acceleration due to gravity, G is the distance between running faces of the rails and R is the radius of the circular curve, the required super elevation is

a.

A

b.

B

c.

C

d.

D

Discuss
Answer: (d).D
Q38.
The ratio of the radius and apex distance of a curve deflecting through ฮ”°, is

a.

A

b.

B

c.

C

d.

D

Discuss
Answer: (a).A
Q39.
ฮฑ, ฮฒ are the horizontal angles measured at the ends of a base line AB to a hill top whose angle of elevation from station A is ฮธ°. The height of the hill top above the trunnion axis of the theodolite station, is

a.

A

b.

B

c.

C

d.

D

Discuss
Answer: (d).D
Q40.
Correct distance obtained by an erroneous chain is:

a.

A

b.

B

c.

C

d.

D

Discuss
Answer: (a).A