Tunnelling MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Tunnelling, a fundamental topic in the field of Civil Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Tunnelling MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Tunnelling mcq questions that explore various aspects of Tunnelling problems. Each MCQ is crafted to challenge your understanding of Tunnelling principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Civil Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Tunnelling MCQs are your pathway to success in mastering this essential Civil Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Tunnelling. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Tunnelling knowledge to the test? Let's get started with our carefully curated MCQs!

Tunnelling MCQs | Page 1 of 5

Discover more Topics under Civil Engineering

Q1.
The cut of a tunnel face is shown in given figure. This is called
Discuss
Answer: (a).Michigan cut
Q2.
In the given figure drill holes, heading, mucking and benching are numbered as 1, 2, 3, 4 The correct sequence is :
Discuss
Answer: (c).4 1 3 2
Q3.
In the wooded bulk-head, used for mucking in steep grade tunnels,
Discuss
Answer: (b).two openings are provided
Q4.
Railway tunnels, are generally
Discuss
Answer: (a).polycentric
Q5.
Pick up the explosive used for tunnelling in soft rocks from the following :
Discuss
Answer: (c).ammonia dynamite
Q6.
For B.G. single track, the section of the tunnel must have a width
Discuss
Answer: (c).4.9 m to 5.5 m
Q7.
Which one of the following statements is not correct for heading and benching method of tunnelling ?
Discuss
Answer: (c).Removal of muck from the heading is very easy
Q8.
The difference of heights of the tunnels above rail tops of BG and MG tracks is kept
Discuss
Answer: (c).0.60 m
Q9.
In case of drift method of tunnelling, the drift may be excavated at
Discuss
Answer: (d).All of the above.
Q10.
A tunnel is found more advantageous as compared to the alternate routes because it:
Discuss
Answer: (d).All the above.