Q. In the given figure drill holes, heading, mucking and benching are numbered as 1, 2, 3, 4 The correct sequence is :
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. In the wooded bulk-head, used for mucking in steep grade tunnels,
View solution
Q. Railway tunnels, are generally
View solution
Q. Pick up the explosive used for tunnelling in soft rocks from the following :
View solution
Q. For B.G. single track, the section of the tunnel must have a width
View solution
Q. Which one of the following statements is not correct for heading and benching method of tunnelling ?
View solution
Q. The difference of heights of the tunnels above rail tops of BG and MG tracks is kept
View solution
Q. In case of drift method of tunnelling, the drift may be excavated at
View solution
Q. A tunnel is found more advantageous as compared to the alternate routes because it:
View solution
Q. For B.G. single track railway, the height of the tunnel above top of rails should be
View solution
Q. Which one of the following methods is generally used for the layout of the muck-car tracks
View solution
Q. For transferring the tunnel alignment through shafts, we adopt the following steps :
1. Hanging two or more plumb lines in the shaft
2. Determining the bearing of the plumb lines i.e. plumb plane
3. Suspending a 35 kg weight by each plumb line
4. Immersing the weights of both the plumb lines in the buckets containing water.
The correct sequence of steps is :
View solution
Q. For initial surveys of tunnels, the following activities are involved:
1. Marking portal point with concrete pillars on the ground
2. Marking tunnel obligatory points on the topographical maps
3. Preliminary setting of the tunnel on the topographical Survey of India maps
4. Driving lines between the fixed obligatory points.
The correct sequence of the activities is :
View solution
Q. For full face method, the excavation to be done is generally divided into
View solution
Q. The tunnels, the artificial underground passages are constructed for :
View solution
Q. Which one of the following methods is generally adopted for tunnelling in firm ground
View solution
Q. An overhead track on a large truss frame is required in case of car changer by
View solution
Q. Pick up the correct statement from the following:
View solution
Q. The length of the needle beam used in needle beam method of tunnelling is usually
View solution
Q. High pressure grouting is generally restored for concreting in the lining if the rock strata is:
View solution
Q. For hauling muck from the tunnel, the following type of muck-car is used :
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!