Question
a.
the grass hopper method
b.
the passing track method
c.
California crossing method
d.
Dixon conveyor method.
Posted under Civil Engineering
Interact with the Community - Share Your Thoughts
Uncertain About the Answer? Seek Clarification Here.
Understand the Explanation? Include it Here.
Q. An overhead track on a large truss frame is required in case of car changer by
Similar Questions
Explore Relevant Multiple Choice Questions (MCQs)
Q. Pick up the correct statement from the following:
View solution
Q. The length of the needle beam used in needle beam method of tunnelling is usually
View solution
Q. High pressure grouting is generally restored for concreting in the lining if the rock strata is:
View solution
Q. For hauling muck from the tunnel, the following type of muck-car is used :
View solution
Q. Which one of the following methods is adopted for permanent drainage of tunnels :
View solution
Q. Pick up the correct statement regarding drilling a tunnel from the following:
View solution
Q. For tunnels exceeding 300 m in length, the grade should be provided below
View solution
Q. The method of draining in the tunnels, is generally known as
View solution
Q. Pick up the correct statement from the following during tunnel excavation,
View solution
Q. To attain the required shape of the tunnel section, we use :
View solution
Q. Pick up the mechanical ventilation method used for tunnels from the following:
View solution
Q. Which one of the following methods of tunnelling does not require the use of time bearing :
View solution
Q. For highways, tunnelling is preferred to if the open cut exceeds :
View solution
Q. The following operations are required for tunnelling in rocky terrain :
1. Removing the foul gases
2. Marking the tunnel profile
3. Setting up and drilling
4. Checking misfire
5. Mucking
The correct sequence is :
View solution
Q. The advantages of providing a pair of tunnels as compared to only one large highway tunnel is :
View solution
Q. Which one of the following statements is not correct in respect of setting of an inclined tunnel:
View solution
Q. Forepoling method is generally adopted for tunnelling in :
View solution
Q. Concrete lining is provided concurrently with the driving operation in case of
View solution
Q. The concentration of the dust particles of the size 0.5 to 5 microns adjacent to the working face should not be more than
View solution
Q. Which one of the following statements is not correct with regard to heading and hench-ing method of tunnelling.
View solution
Recommended Subjects
Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.
Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!