Waste Water Engineering MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Waste Water Engineering, a fundamental topic in the field of Civil Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Waste Water Engineering MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Waste Water Engineering mcq questions that explore various aspects of Waste Water Engineering problems. Each MCQ is crafted to challenge your understanding of Waste Water Engineering principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Civil Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Waste Water Engineering MCQs are your pathway to success in mastering this essential Civil Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Waste Water Engineering. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Waste Water Engineering knowledge to the test? Let's get started with our carefully curated MCQs!

Waste Water Engineering MCQs | Page 30 of 32

Discover more Topics under Civil Engineering

Q291.
The sewer which collects the discharge from a collecting system and delivers it to a treatment plant, is known
Discuss
Answer: (d).sewer outfall.
Q292.
If the depletion of oxygen is found to be 5 ppm after incubating a 2.5% solution of sewage sample for 5 days at 21°C, B.O.D. of the sewage is
Discuss
Answer: (d).200 ppm
Q293.
Setting out the alignments of sewers may start from
Discuss
Answer: (c).tail end
Q294.
If the flame of a miner's safety lamp in the upper layers of the sewer forms an explosive, the sewer certainly contains
Discuss
Answer: (c).Methane
Q295.
In normal conditions, the period for sludge digestion, is
Discuss
Answer: (c).30 days
Q296.
The bottom of the sewage inlet chamber of septic tanks, is provided an outward slope
Discuss
Answer: (b).1 in 10
Discuss
Answer: (d).all the above.
Discuss
Answer: (d).all the above.
Q299.
Which of the following pumps in used to pump sewage solids with liquid sewage without clogging the pump is
Discuss
Answer: (a).centrifugal pump
Q300.
The quantity of liquid waste which flows in sewers during the period of rainfall, is known
Discuss
Answer: (c).storm sewage