Water Supply Engineering MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Water Supply Engineering, a fundamental topic in the field of Civil Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Water Supply Engineering MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Water Supply Engineering mcq questions that explore various aspects of Water Supply Engineering problems. Each MCQ is crafted to challenge your understanding of Water Supply Engineering principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Civil Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Water Supply Engineering MCQs are your pathway to success in mastering this essential Civil Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Water Supply Engineering. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Water Supply Engineering knowledge to the test? Let's get started with our carefully curated MCQs!

Water Supply Engineering MCQs | Page 23 of 36

Discover more Topics under Civil Engineering

Q221.
Property of earth to allow water to pass through it, is known as
Discuss
Answer: (a).perviousness
Discuss
Answer: (d).None of these.
Q223.
Water is supplied from the source to the treatment plant under gravity in
Discuss
Answer: (d).Bombay.
Q224.
The most ideal disinfectant used for drinking water throughout the world, is
Discuss
Answer: (c).chlorine
Q225.
A centrifugal pump is required to be primed before starting if it is located
Discuss
Answer: (a).at higher level than water level of reservoir
Q226.
The maximum pressure which the pipe can withstand without any leakage during hydrostatic pressure test, is called
Discuss
Answer: (c).Test pressure
Q227.
Filtration of water is done to remove
Discuss
Answer: (c).turbidity
Q228.
Generally, first portion of a logistic curve for the population growth of a developing city, represents the growth of
Discuss
Answer: (a).increasing
Discuss
Answer: (c).be located downstream of waste water disposal point
Discuss
Answer: (a).are not suitable for variable heads