Highway Alignment and Project Preparation MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Highway Alignment and Project Preparation, a fundamental topic in the field of Highway Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Highway Alignment and Project Preparation MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Highway Alignment and Project Preparation mcq questions that explore various aspects of Highway Alignment and Project Preparation problems. Each MCQ is crafted to challenge your understanding of Highway Alignment and Project Preparation principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Highway Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Highway Alignment and Project Preparation MCQs are your pathway to success in mastering this essential Highway Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Highway Alignment and Project Preparation. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Highway Alignment and Project Preparation knowledge to the test? Let's get started with our carefully curated MCQs!

Highway Alignment and Project Preparation MCQs | Page 2 of 5

Q11.
The surveys of highway alignment are completed in how many stages?
Discuss
Answer: (d).Four
Q12.
The maps in India related to topography are prepared by __________
Discuss
Answer: (b).Survey of India
Q13.
The survey in which details are covered roughly but not accurately is called __________
Discuss
Answer: (a).Reconnaissance
Q14.
The soil survey is conducted in which of the following survey?
Discuss
Answer: (a).Preliminary survey
Q15.
A closed loop used for survey purpose is called __________
Discuss
Answer: (b).Closed traverse
Discuss
Answer: (c).Global position system
Q17.
The intervals for levelling work in rolling terrain are taken as __________
Discuss
Answer: (a).50 m
Q18.
What is the first step in a preliminary survey?
Discuss
Answer: (a).Primary traverse
Q19.
The surface thickness of the pavement is decided based on __________
Discuss
Answer: (a).HFL
Q20.
The key map size should not exceed __________
Discuss
Answer: (a).20*22 cm