Highway Alignment and Project Preparation MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Highway Alignment and Project Preparation, a fundamental topic in the field of Highway Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Highway Alignment and Project Preparation MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Highway Alignment and Project Preparation mcq questions that explore various aspects of Highway Alignment and Project Preparation problems. Each MCQ is crafted to challenge your understanding of Highway Alignment and Project Preparation principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Highway Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Highway Alignment and Project Preparation MCQs are your pathway to success in mastering this essential Highway Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Highway Alignment and Project Preparation. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Highway Alignment and Project Preparation knowledge to the test? Let's get started with our carefully curated MCQs!

Highway Alignment and Project Preparation MCQs | Page 5 of 5

Discover more Topics under Highway Engineering

Q41.
The final step in the specifications and design of roadway elements is ___________
Discuss
Answer: (d).Safety and audit of the design elements
Q42.
Which of the following is not a structure constructed for drainage purposes?
Discuss
Answer: (d).Pitot tube
Q43.
The strength of the materials can be checked by ___________
Discuss
Answer: (b).Quality control
Q44.
For small projects which type of method is used for the calculation of project time?
Discuss
Answer: (b).Bar chart
Q45.
Which of the following is prepared first during estimate?
Discuss
Answer: (a).Schedule of rates
Q46.
The site amenities are covered under which of the items of DPR?
Discuss
Answer: (c).Miscellaneous