Highway Alignment and Project Preparation MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Highway Alignment and Project Preparation, a fundamental topic in the field of Highway Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Highway Alignment and Project Preparation MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Highway Alignment and Project Preparation mcq questions that explore various aspects of Highway Alignment and Project Preparation problems. Each MCQ is crafted to challenge your understanding of Highway Alignment and Project Preparation principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Highway Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Highway Alignment and Project Preparation MCQs are your pathway to success in mastering this essential Highway Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Highway Alignment and Project Preparation. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Highway Alignment and Project Preparation knowledge to the test? Let's get started with our carefully curated MCQs!

Highway Alignment and Project Preparation MCQs | Page 4 of 5

Q31.
Inspection of the site is done in which survey?
Discuss
Answer: (c).Reconnaissance
Q32.
Road roughness is tested by ___________
Discuss
Answer: (a).Bump integrator
Q33.
To minimize the cost of the project the most suitable method is ___________
Discuss
Answer: (a).CPM
Discuss
Answer: (a).Providing additional thickness of the pavement
Q35.
Embankments are provided on a highway near ___________
Discuss
Answer: (c).Railway tracks and highly flooded area
Q36.
The drawing for re alignment shows the existing road, proposed re alignment, contours and all other features it is called as ___________
Discuss
Answer: (a).Plan
Q37.
The DPR consists of how many components?
Discuss
Answer: (c).Three
Q38.
The first step in the detail checklist of DPR is ___________
Discuss
Answer: (a).Executive summary
Q39.
The name of the work and project details is managed under which category of DPR?
Discuss
Answer: (b).Background
Q40.
The roadway features include the study of ___________
Discuss
Answer: (c).Route alignment
Page 4 of 5