Highway Alignment and Project Preparation MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Highway Alignment and Project Preparation, a fundamental topic in the field of Highway Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Highway Alignment and Project Preparation MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Highway Alignment and Project Preparation mcq questions that explore various aspects of Highway Alignment and Project Preparation problems. Each MCQ is crafted to challenge your understanding of Highway Alignment and Project Preparation principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Highway Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Highway Alignment and Project Preparation MCQs are your pathway to success in mastering this essential Highway Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Highway Alignment and Project Preparation. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Highway Alignment and Project Preparation knowledge to the test? Let's get started with our carefully curated MCQs!

Highway Alignment and Project Preparation MCQs | Page 3 of 5

Discover more Topics under Highway Engineering

Q21.
The index map shows __________
Discuss
Answer: (a).Topography
Q22.
Detailed size drawings are prepared in which sheet?
Discuss
Answer: (b).A2
Q23.
The cross sections should be drawn for every __________
Discuss
Answer: (d).100 m
Q24.
The approximate cost of construction evaluated for the project is called __________
Discuss
Answer: (c).Estimate
Q25.
The report that includes all the works including soil, bridges, topography, material studies and drainage studies is called as __________
Discuss
Answer: (b).Detailed project report
Q26.
The planning, design and construction of either a network of new roads or road link is called __________
Discuss
Answer: (a).Highway project
Discuss
Answer: (d).Present requirements and future requirements
Q28.
The New highway project is divided into how many stages?
Discuss
Answer: (c).Three
Q29.
A part of land that is acquired during the initial stages of construction for future expansion is called ____________
Discuss
Answer: (c).Right of way
Q30.
Which method is recommended by IRC for flexible pavements?
Discuss
Answer: (a).CBR