Surveys and Construction of Railway Lines MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Surveys and Construction of Railway Lines, a fundamental topic in the field of Railway Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Surveys and Construction of Railway Lines MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Surveys and Construction of Railway Lines mcq questions that explore various aspects of Surveys and Construction of Railway Lines problems. Each MCQ is crafted to challenge your understanding of Surveys and Construction of Railway Lines principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Railway Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Surveys and Construction of Railway Lines MCQs are your pathway to success in mastering this essential Railway Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Surveys and Construction of Railway Lines. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Surveys and Construction of Railway Lines knowledge to the test? Let's get started with our carefully curated MCQs!

Surveys and Construction of Railway Lines MCQs | Page 6 of 8

Discover more Topics under Railway Engineering

Q51.
What is the first step involved in Construction of a New line?
Discuss
Answer: (b).Land acquisition
Q52.
Where should one refer to for the procedure of acquisition of land with the help of member state government?
Discuss
Answer: (a).Land Acquisition act
Q53.
If we want to construct a single line railway track, the land available should be adequate for the construction of a double line.
Discuss
Answer: (a).True
Q54.
What does the slide slope provided for the embankment depends upon?
Discuss
Answer: (c).Nature of soil
Q55.
Why is the Formation of an embankment preferred over formation in a cutting?
Discuss
Answer: (b).It has good drainage properties
Discuss
Answer: (c).To obtain maximum dry density at optimum moisture content
Q57.
Which curve is used to determine the economical lead of moving earth in the longitudinal direction?
Discuss
Answer: (a).Mass-haul curve
Q58.
Why is the section where earthwork is to be done, divided into different zones?
Discuss
Answer: (b).For early execution of earthwork
Discuss
Answer: (c).Topography and Type of stream
Q60.
Which of the following is not a part of Plate laying or Track linking?
Discuss
Answer: (b).Formation of embankment or cutting
Page 6 of 8