Track and Track Stresses MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Track and Track Stresses, a fundamental topic in the field of Railway Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Track and Track Stresses MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Track and Track Stresses mcq questions that explore various aspects of Track and Track Stresses problems. Each MCQ is crafted to challenge your understanding of Track and Track Stresses principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Railway Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Track and Track Stresses MCQs are your pathway to success in mastering this essential Railway Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Track and Track Stresses. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Track and Track Stresses knowledge to the test? Let's get started with our carefully curated MCQs!

Track and Track Stresses MCQs | Page 1 of 4

Q1.
What measure is taken in case of curves to account for the centrifugal force acting on the train?
Discuss
Answer: (a).Superelevation is provided
Q2.
Why the railway track is made resilient and elastic?
Discuss
Answer: (b).So that it absorbs shocks
Q3.
Which of the following is not a requirement of a good track?
Discuss
Answer: (c).Aesthetic appearance
Discuss
Answer: (a).Length of rail in meters
Q5.
Which method is mostly used for converting short welded rails to long welded rails?
Discuss
Answer: (b).Thermit welding
Discuss
Answer: (b).Gross million tonnes per km/annum
Q7.
What is the minimum ballast cushion provided for Concrete sleepers?
Discuss
Answer: (b).250 mm
Q8.
What does an ‘S3’ route denote in case of MG track?
Discuss
Answer: (a).Uneconomical branch line
Discuss
Answer: (c).To ensure safety and comfort of public
Q10.
Which among the following is an old method for track maintenance?
Discuss
Answer: (b).Beater packing
Page 1 of 4