Building Construction MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Building Construction, a fundamental topic in the field of Civil Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Building Construction MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Building Construction mcq questions that explore various aspects of Building Construction problems. Each MCQ is crafted to challenge your understanding of Building Construction principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Civil Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Building Construction MCQs are your pathway to success in mastering this essential Civil Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Building Construction. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Building Construction knowledge to the test? Let's get started with our carefully curated MCQs!

Building Construction MCQs | Page 14 of 26

Discover more Topics under Civil Engineering

Q131.
The concrete slump recommended for columns, is
Discuss
Answer: (c).75 to 125 mm
Q132.
The inner section of a cavity wall, is generally known as
Discuss
Answer: (b).leaf wall
Q133.
The inclined support at the ends of treads and rises of a stair, is known as
Discuss
Answer: (c).string
Discuss
Answer: (d).all the above.
Q135.
The vertical side member of a shutter frame, is known
Discuss
Answer: (a).style
Q136.
The brick laid with its length parallel to the face of a wall, is a known as
Discuss
Answer: (b).stretcher
Discuss
Answer: (a).3.5 m or less
Q138.
If the depth of an excavation is 20 metres, number of single stage well points to be installed at various levels, is

a.

5

b.

4

c.

3

d.

2

Discuss
Answer: (c).3
Q139.
The minimum distance between the centres of bulb of diameter du, of a multi under reamed piles, is
Discuss
Answer: (c).1.5 du
Q140.
The method of moving each brick through a small horizontal distance before it is finally laid in any brick wall and pressing it by means of brick hammer, is known as
Discuss
Answer: (b).laying