Building Construction MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Building Construction, a fundamental topic in the field of Civil Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Building Construction MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Building Construction mcq questions that explore various aspects of Building Construction problems. Each MCQ is crafted to challenge your understanding of Building Construction principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Civil Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Building Construction MCQs are your pathway to success in mastering this essential Civil Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Building Construction. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Building Construction knowledge to the test? Let's get started with our carefully curated MCQs!

Building Construction MCQs | Page 4 of 26

Discover more Topics under Civil Engineering

Discuss
Answer: (c).Revolving door is generally provided in cinema halls
Q32.
The angular steps used for changing direction of the stairs, are called
Discuss
Answer: (c).winders
Discuss
Answer: (d).all the above.
Discuss
Answer: (d).all the above.
Q35.
A projecting piece usually provided to support a truss, is
Discuss
Answer: (c).frieze
Q36.
The line of intersection of the surfaces of a sloping roof forming an external angle exceeding 180°, is
Discuss
Answer: (b).hip
Discuss
Answer: (d).all the above.
Q38.
The exterior angle between outer faces of a wall, is known as
Discuss
Answer: (c).quion
Discuss
Answer: (d).1/12th of the span
Q40.
While designing a stair, the product of rise and going is approximately kept equal to
Discuss
Answer: (b).420