Waste Water Engineering MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Waste Water Engineering, a fundamental topic in the field of Civil Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Waste Water Engineering MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Waste Water Engineering mcq questions that explore various aspects of Waste Water Engineering problems. Each MCQ is crafted to challenge your understanding of Waste Water Engineering principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Civil Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Waste Water Engineering MCQs are your pathway to success in mastering this essential Civil Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Waste Water Engineering. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Waste Water Engineering knowledge to the test? Let's get started with our carefully curated MCQs!

Waste Water Engineering MCQs | Page 13 of 32

Discover more Topics under Civil Engineering

Discuss
Answer: (d).none of these.
Q122.
Primary treatment of sewage consists of removal of
Discuss
Answer: (a).large suspended organic solids
Q123.
If the depth of flow in a circular sewer is 1/4th of its diameter D, the wetted perimeter is
Discuss
Answer: (c).ฯ€D/3
Q124.
The maximum diameter of sewers adopted in the designs is
Discuss
Answer: (c).3.0 m
Q125.
Sluge banks are formed if sewage is disposed of in
Discuss
Answer: (b).seas
Q126.
Design period of 40 to 50 years is adopted for
Discuss
Answer: (d).all the above.
Q127.
The pH value of sewage is determined with the help of
Discuss
Answer: (c).potentiometer
Q128.
The maximum spacing of manholes specified by Indian standard in sewers upto 0.3 m diameter is
Discuss
Answer: (c).45 m
Q129.
The design period in years for pumping plants, is
Discuss
Answer: (d).5 to 10
Q130.
The Chezy's constant C in the formula V = C โˆšrs depends upon
Discuss
Answer: (d).all the above.