Waste Water Engineering MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Waste Water Engineering, a fundamental topic in the field of Civil Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Waste Water Engineering MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Waste Water Engineering mcq questions that explore various aspects of Waste Water Engineering problems. Each MCQ is crafted to challenge your understanding of Waste Water Engineering principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Civil Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Waste Water Engineering MCQs are your pathway to success in mastering this essential Civil Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Waste Water Engineering. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Waste Water Engineering knowledge to the test? Let's get started with our carefully curated MCQs!

Waste Water Engineering MCQs | Page 15 of 32

Discover more Topics under Civil Engineering

Q141.
The sewer which resists sulphide corrosion, is
Discuss
Answer: (d).Lead sewer
Q142.
Ventilating shafts are provided to a sewer line at every
Discuss
Answer: (d).300 m
Q143.
Which one of the following part of human body withstands minimum radiation
Discuss
Answer: (d).ovaries/testis.
Q144.
The water carried sewerage system removes
Discuss
Answer: (d).all the above.
Q145.
Stoneware sewers are available in size
Discuss
Answer: (d).all the above.
Q146.
The sludge does not contain waste water from
Discuss
Answer: (d).toilets.
Q147.
Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for
Discuss
Answer: (d).All of the above.
Q148.
5 days-biochemical oxygen demand (BODโ‚…) is taken at a temperature of
Discuss
Answer: (c).20°C
Q149.
Water content of sewage is about
Discuss
Answer: (c).99.9%
Discuss
Answer: (d).settleable solids.