Waste Water Engineering MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Waste Water Engineering, a fundamental topic in the field of Civil Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Waste Water Engineering MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Waste Water Engineering mcq questions that explore various aspects of Waste Water Engineering problems. Each MCQ is crafted to challenge your understanding of Waste Water Engineering principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Civil Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Waste Water Engineering MCQs are your pathway to success in mastering this essential Civil Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Waste Water Engineering. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Waste Water Engineering knowledge to the test? Let's get started with our carefully curated MCQs!

Waste Water Engineering MCQs | Page 6 of 32

Discuss
Answer: (c).at an angle 30° to 60° to the direction of flow
Q52.
In primary sedimentation, the 0.2 mm inorganic solids get separated if specific gravity is
Discuss
Answer: (d).2.65
Discuss
Answer: (c).Inlets are generally provided in all sewers
Q54.
The minimum recommended diameter of sewers, is
Discuss
Answer: (c).15 cm
Discuss
Answer: (d).All the above.
Q56.
The rate of accumulation of sludge in septic tanks is recommended as
Discuss
Answer: (a).30 litres/person/year
Q57.
If 2% solution of a sewage sample is incubated for 5 days at 20°C and depletion of oxygen was found to be 5 ppm, B.O.D. of the sewage is
Discuss
Answer: (c).250 ppm
Q58.
If D is the diameter of upper circular portion, the overall depth of a standard egg shaped section, is
Discuss
Answer: (c).1.5 D
Discuss
Answer: (d).All the above.
Q60.
In olden days the type of section adopted in trunk and out fall sewers was
Discuss
Answer: (b).horse shoe shaped