Waste Water Engineering MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Waste Water Engineering, a fundamental topic in the field of Civil Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Waste Water Engineering MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Waste Water Engineering mcq questions that explore various aspects of Waste Water Engineering problems. Each MCQ is crafted to challenge your understanding of Waste Water Engineering principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Civil Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Waste Water Engineering MCQs are your pathway to success in mastering this essential Civil Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Waste Water Engineering. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Waste Water Engineering knowledge to the test? Let's get started with our carefully curated MCQs!

Waste Water Engineering MCQs | Page 7 of 32

Discover more Topics under Civil Engineering

Q61.
In a fully mechanised composting plant, involves
Discuss
Answer: (d).all of these.
Discuss
Answer: (c).velocity at which no accumulation remains in the drains
Q63.
Fresh sewage may become stale in
Discuss
Answer: (c).three to four hours
Q64.
The small sewers are cleaned by
Discuss
Answer: (a).flushing
Discuss
Answer: (d).inclusive of domestic and industrial sewage but excludes storm water.
Q66.
Which one of the following tests is used for testing sewer pipes :
Discuss
Answer: (d).all of these.
Discuss
Answer: (a).Liberation of ammonia-formation of nitrites-formation of nitrates-liberation of nitrogen
Q68.
In sewers the highest non-scouring velocity is achieved in
Discuss
Answer: (a).glazed bricks sewers
Q69.
In sewage having fully oxidised organic matter, the nitrogen exists in the form of
Discuss
Answer: (b).nitrates
Q70.
It is customary to design a sewer for D.W.F. on the basis of
Discuss
Answer: (c).thrice the average demand