Dam Design and Construction MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Dam Design and Construction, a fundamental topic in the field of Irrigation Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Dam Design and Construction MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Dam Design and Construction mcq questions that explore various aspects of Dam Design and Construction problems. Each MCQ is crafted to challenge your understanding of Dam Design and Construction principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Irrigation Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Dam Design and Construction MCQs are your pathway to success in mastering this essential Irrigation Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Dam Design and Construction. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Dam Design and Construction knowledge to the test? Let's get started with our carefully curated MCQs!

Dam Design and Construction MCQs | Page 2 of 16

Discover more Topics under Irrigation Engineering

Q11.
The average grain size of the bed material is 0.16 mm for medium silt, Lacey’s silt factor is likely to be _______
Discuss
Answer: (c).0.70
Q12.
The waterway for a bridge on the river in alluvial plain having a dominant discharge of 3600 cumecs should be ________ m.
Discuss
Answer: (b).285 m
Q13.
Greater is the afflux, lesser will be the available clearance for the same deck level.
Discuss
Answer: (a).True
Q14.
Greater is the reduction in the linear waterway, the lesser is the afflux.
Discuss
Answer: (b).False
Q15.
The proposed masonry arch bridge having the total height of its abutments or piers from top to bottom as H can be proposed to have economical spans each equal to ______
Discuss
Answer: (b).2H
Q16.
A bridge culvert is to be constructed across a proposed lined canal. The afflux at this site for a contracted canal width can be computed by __________
Discuss
Answer: (d).Molesworth formula
Q17.
While going to the Tirupati Tirumala Devasthanam from Madras, highway road is found to be lowered at several places over which natural drainage flow during the rainy season. Such dips in the roads are called ___________________
Discuss
Answer: (c).causeways
Q18.
Which of the following formula is valid when the downstream depth is more than 80% of the upstream depth?
Discuss
Answer: (c).Orifice formula
Q19.
What is the value of the coefficient of discharge for the wide bridge opening with floors?
Discuss
Answer: (c).0.96
Q20.
Calculate the economic length of one span for RCC Slab Bridge if the total height of abutment or pier from the bottom of its foundation to its top is 6m.
Discuss
Answer: (c).9 m