Question

The area of a sloping surface of a protective embankment of mean height d, side slopes S : 1 and length L is

a.

A

b.

B

c.

C

d.

D

Answer: (c).C

Interact with the Community - Share Your Thoughts

Uncertain About the Answer? Seek Clarification Here.

Understand the Explanation? Include it Here.

Q. The area of a sloping surface of a protective embankment of mean height d, side slopes S : 1 and length L is

Similar Questions

Explore Relevant Multiple Choice Questions (MCQs)

Q. The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is

Q. The value of 'A' of Indian type W.C. shown in the given figure is :

Q. Referring of given figure, pick up the correct statement from the following:

Q. The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is

Q. The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is

Q. The value of 'B' of Indian type W.C. shown in the given figure is :

Q. In the mid-section formula

Q. The item of steel work which is measured in sq.m, is

Q. If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by

Q. The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is

Q. While estimating a reinforced cement structure, the omitted cover of concrete is assumed

Q. The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as

Q. Pick up the incorrect statement from the following:

Q. If tensile stress of a steel rod of diameter D is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is

Q. Pick up the correct statement in case of water supply.

Q. In case of laying gullies, siphons, intercepting traps, the cost includes

Q. In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

Q. The height of the sink of wash basin above floor level is kept

Q. While preparing a detailed estimate

Q. The plinth area of a building not includes

Recommended Subjects

Are you eager to expand your knowledge beyond Civil Engineering? We've handpicked a range of related categories that you might find intriguing.

Click on the categories below to discover a wealth of MCQs and enrich your understanding of various subjects. Happy exploring!