Estimating and Costing MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Estimating and Costing, a fundamental topic in the field of Civil Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Estimating and Costing MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Estimating and Costing mcq questions that explore various aspects of Estimating and Costing problems. Each MCQ is crafted to challenge your understanding of Estimating and Costing principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Civil Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Estimating and Costing MCQs are your pathway to success in mastering this essential Civil Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Estimating and Costing. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Estimating and Costing knowledge to the test? Let's get started with our carefully curated MCQs!

Estimating and Costing MCQs | Page 4 of 10

Discover more Topics under Civil Engineering

Q31.
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.
Discuss
Answer: (d).27, 500 m³
Discuss
Answer: (a).Length, breadth, height
Q33.
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
Discuss
Answer: (d).All the above.
Q34.
Pick up the item of work not included in the plinth area estimate
Discuss
Answer: (d).Courtyard area.
Discuss
Answer: (d).All the above.
Q36.
The brick work is measured in sq metre, in case of
Discuss
Answer: (d).All the above.
Q37.
Brick walls are measured in sq. m if the thickness of the wall is
Discuss
Answer: (a).10 cm
Discuss
Answer: (a).Detailed estimate
Q39.
The expected out turn of 12 mm plastering with cement mortar is
Discuss
Answer: (d).8.0 sq m
Q40.
The main factor to be considered while preparing a detailed estimate, is
Discuss
Answer: (d).All the above.