Estimating and Costing MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Estimating and Costing, a fundamental topic in the field of Civil Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Estimating and Costing MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Estimating and Costing mcq questions that explore various aspects of Estimating and Costing problems. Each MCQ is crafted to challenge your understanding of Estimating and Costing principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Civil Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Estimating and Costing MCQs are your pathway to success in mastering this essential Civil Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Estimating and Costing. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Estimating and Costing knowledge to the test? Let's get started with our carefully curated MCQs!

Estimating and Costing MCQs | Page 9 of 10

Q81.
The trap which is provided to disconnect the house drain from the street sewer is called
Discuss
Answer: (d).All the above.
Discuss
Answer: (d).The unit of lead is 1 km where the lead exceeds 2 km.
Discuss
Answer: (d).All the above.
Q84.
The brick work is not measured in cu m in case of
Discuss
Answer: (d).Half brick wall.
Discuss
Answer: (d).All the above.
Discuss
Answer: (d).All the above.
Discuss
Answer: (d).All the above.
Q88.
The expected out turn of half brick partition wall per mason per day is
Discuss
Answer: (b).2.0 m³
Q89.
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is
Discuss
Answer: (b).Bd + Sd²
Q90.
The floor area includes the area of the balcony up to
Discuss
Answer: (c).50%