Estimating and Costing MCQs

Welcome to our comprehensive collection of Multiple Choice Questions (MCQs) on Estimating and Costing, a fundamental topic in the field of Civil Engineering. Whether you're preparing for competitive exams, honing your problem-solving skills, or simply looking to enhance your abilities in this field, our Estimating and Costing MCQs are designed to help you grasp the core concepts and excel in solving problems.

In this section, you'll find a wide range of Estimating and Costing mcq questions that explore various aspects of Estimating and Costing problems. Each MCQ is crafted to challenge your understanding of Estimating and Costing principles, enabling you to refine your problem-solving techniques. Whether you're a student aiming to ace Civil Engineering tests, a job seeker preparing for interviews, or someone simply interested in sharpening their skills, our Estimating and Costing MCQs are your pathway to success in mastering this essential Civil Engineering topic.

Note: Each of the following question comes with multiple answer choices. Select the most appropriate option and test your understanding of Estimating and Costing. You can click on an option to test your knowledge before viewing the solution for a MCQ. Happy learning!

So, are you ready to put your Estimating and Costing knowledge to the test? Let's get started with our carefully curated MCQs!

Estimating and Costing MCQs | Page 5 of 10

Discover more Topics under Civil Engineering

Discuss
Answer: (d).All the above.
Q42.
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
Discuss
Answer: (d).5.0 m³
Q43.
The measurement is not made in square metres in case of
Discuss
Answer: (d).R.C. Chhajja.
Q44.
According to ISI method of measurement, the order of the sequence is
Discuss
Answer: (a).Length, breadth, height
Discuss
Answer: (d).All the above.
Discuss
Answer: (d).All the above.
Q47.
The detention period in a septic tank is assumed
Discuss
Answer: (c).30 minutes
Q48.
The area is measured correct to the nearest
Discuss
Answer: (a).0.01 sqm
Q49.
Cost of fittings and their fixing is specified for the following sanitary fittings
Discuss
Answer: (d).All the above.
Q50.
The volume is measured correct to the nearest
Discuss
Answer: (a).0.01 cum